跪求:英语翻译成中中文(暖通方面)急!!!!!!!!!!!!!!!!!!!!!! 英语(中文翻英文)翻译,急!!!!!!!!!!!!!!!!!...

作者&投稿:郟庙 (若有异议请与网页底部的电邮联系)
The design of the Agricultural Bank of China Beijing Branch Building air-conditioning system. The composite floor against the functional requirements and characteristics, as well as to the weather conditions and air-conditioning requirements, reference to the literature on the building in the central air-conditioning system for program identification, design and selection of equipment. The design of buildings in the air-conditioned area of 5171.04 ㎡. Depending on the local meteorological parameters outdoor and indoor air to maintain the parameters of the load calculation, Buildings from the summer cooling load for 357695.6 W, appeared in 13 : 00 summer cooling load indicators 69.17286W/m2; Winter heat load for 313637W. Winter heat index of 60 .65W/m2. With the completion of the entire building cold, heat, moisture load, the calculation of the wind, all of the air-conditioning program, In a final decision, the two-story great hall space, shopping centers and large conference room to choose a style all-air system; The small two-story room to use space fan-coil plus an independent ventilation system; 3 chiutsengta used to fan-coil plus an independent ventilation system. Then duct, pipes, hydraulic calculation. Finally, according to various calculations, the parties, the selection of equipment to ensure that the equipment capacity, pressure, Noise and other areas to meet demand. The design seeks to achieve economic, comfortable, convenient, energy-saving goals.

The design of the Agricultural Bank of China Beijing Branch Building air-conditioning system. The composite floor against the functional requirements and characteristics, as well as to the weather conditions and air-conditioning requirements, reference to the literature on the building in the central air-conditioning system for program identification, design and selection of equipment. The design of buildings in the air-conditioned area of 5171.04 ㎡. Depending on the local meteorological parameters outdoor and indoor air to maintain the parameters of the load calculation, Buildings from the summer cooling load for 357695.6 W, appeared in 13 : 00 summer cooling load indicators 69.17286W/m2; Winter heat load for 313637W. Winter heat index of 60 .65W/m2. With the completion of the entire building cold, heat, moisture load, the calculation of the wind, all of the air-conditioning program, In a final decision, the two-story great hall space, shopping centers and large conference room to choose a style all-air system; The small two-story room to use space fan-coil plus an independent ventilation system; 3 chiutsengta used to fan-coil plus an independent ventilation system. Then duct, pipes, hydraulic calculation.
Finally, according to various calculations, the parties, the selection of equipment to ensure that the equipment capacity, pressure, Noise and other areas to meet demand. The design seeks to achieve economic, comfortable, convenient, energy-saving goals.

Key words : air systems, fan coil unit, independent new wind, hydro calculation

What this time design is the Chinese agriculture bank Peking to pay to go the comprehensive building air condition system.Aim at function request and characteristicses that should synthesize the building, and the ground's weather condition and the air condition request, consult the relevant cultural heritage data to that building of central air condition system carry on project assurance, design's compute to choose the type with equipments.
The air condition area of this design building is 5171.04 ㎡s.Carry on the burden calculation according to the air parameter that the local outdoors weather parameter and indoor request keep, income the summer of building is cold to carry for the 357695.6 Ws, appear at 13:The cold burden index sign is the 69.17286 Ws/ m200 summers;In winter the heat carries for the 313637 Ws, the hot index sign of winter is a 60.65 Ws/ m2.After complete the calculation to the whole burden with cold, hot and wet building of 栋 , the breeze quantity, pass to various comparison of air condition project, the end decision chooses to return to breeze whole air system once in an and two strong space business hall, market and strong board rooms of the layers;Two small space room choice of the layers use the breeze machine dish tube to add independent new breeze system;The 3-9 layers adopt the breeze machine dish tube to add independent new breeze system.Then carry on the water power calculation of the breeze tube, pipe line.
Finally according to various calculation result, pass the everyone to compare, carry on the equipments to choose the type, insure the equipments in the capacity, press strong, the 噪 an etc. the everyone faces to satisfy the request.The design of the system tries hard for to attain the economy, comfort, convenience, economy energy of target.

Keyword:The whole air system, the breeze machine dish tube, independent new breeze, water power calculation

金山快译可以翻译的 我 建议你去用用 (真的很好用的)

请帮我把下面的英语短文翻译成中文谢谢!~

在英语中,冠词+时间可以代表时间状语,而且像the moment,the minute,the instant这些词还可以引导时间状语从句

Throughout the preparation process, I found that students participating in enthusiasm high, cooperate do well, not put forward a lot of interesting questions, they feel the experiment in the process of glamour, also felt setbacks, that is what we education should meet, but we've ever used too much of a sermon replaced, such as a group of students want to study the influence of catalyst on chemical reaction, they want to use research various catalyst for hydrogen peroxide decomposition of influence, and by using pressure sensor to measure the oxygen produced much, this is a very good idea, but has trouble, carries on the early experiments found that produced gas overmuch, in airtight container, measuring pressure is very dangerous, the group's classmates will explore further containers.
Another group to determine the quality, the alcohol Moore is of significance, but the problem is, how to constant quality of liquid alcohol into gases, by means of measuring the pressure and temperature measurement Moore quality, they haven't think good, I think encounter problems are good, we need to cultivate creative talents, in such exchanges, I saw the shadow.

Anyhow, I want to do what topics, all is the carrier, my aim is through the communication, enhance mutual understanding, friendship, more enough mutual learning, change their intrinsic mode of teaching and learning model, trying to explore, which not only conforms to the condition of a country, and efficient teaching and learning mode, students will be made in reducing load conditions, to learn more interested in, the more active, to the question of understanding deeper, more healthy, happy, learning, I'll say this much, thank you.

求英文翻译: 公司名称:山西拓邦暖通工程有限公司
答:Shanxi Tuobang HVAC Engineering Co., Ltd.

暖通专业英语翻译,需手工译文
答:查看库中的部分监狱,监狱,和家庭法庭 的牢房和的美国法警空间(24小时空间)一个独立的空气处理系统捆绑到主HVAC系统的讨论,应该是能够独立运作后小时。一个单独的 100%新鲜空气和排气系统应提供的牢房里,它应该有安全的格栅和障碍栏,并 应保持负压,应被视为正常的办公区。元帅的空间,除了 细胞...

暖通专业英文翻译软件哪个最好
答:个人感觉,谷歌的在线翻译相对好一些吧,对于专业英语的翻译,现在这些翻译软件的水平基本上都是差不多的。

哪位牛人帮忙翻译一下这篇有关暖通空调专业的英语文章?小弟在此拜谢...
答:防腐蚀 防腐蚀需要选择适当的材料和防腐剂,对PH的常规检验和除去污染物。由于使用具有潜在腐蚀性的氯化钙和氯化钠盐水的冷却系统被广泛应用,故必须每月对盐水溶液进行测试和调整。使用浓缩液而不用晶体来补充盐水,是因为这样更容易处理和混合。

英语翻译成汉语(暖通专业)手工翻译 软件的不要谢谢 成功+50
答:节省能源作用在减少被瞄准的PMV 价值变得大在所有空气冷却系统与辐射盘区系统比较。相当数量易察觉和潜在冷却的装载几乎是相同。有效的温度、卑鄙辐射温度, 和HVAC 系统的条件被显示在无花果9 。关于易察觉的冷却的装载160W 和320W 被保存当衣物水平由0.1 col 减少下来为辐射盘区系统并且所有空气冷却系统...

工程英语汉译英,机器勿进
答:Chilled water pipes adopt formaldehyde-free environment-friendly glass wool pipe shell with protective veneer. The outside is protected by aluminum in which the insulation density is 64kg/m3, thermal conductivity ≤ 0.043w/mk, combustibility level: A, non-combustible material. Outdoor...

英语翻译成汉语(暖通专业)手工翻译 软件的不要谢谢 成功+50
答:审查新CFD 方法的表现, 冷却的装载和热量环境在半封闭空间, 打开入心房空间, 被分析。使用CFD 模仿, 冷却的装载定量地估计为各种各样的目标室内热量情况。对节省能源的作用由改变居住者的衣物条件并且被分析。 2? 对流、辐射, 和HVAC 控制的被结合的模仿 反馈系统, 修改HVAC 控制系统的条件, 依照被...

那位学暖通空调的牛人帮忙翻译一下这篇专业英语?
答:有效的舒适性通风基于以下原则:风应在充足动力和足够低的温度条件下直接送至工作区,通过对流和蒸发的方式使工人周围冷却。在大多数情况下,舒适性通风考虑的方案是假定排风、辐射隔离、绝缘设备以及工艺设计中的可能性改变这些手段已得到充分的利用来使热负荷降至最低。另外,送风气流不可在热设备或热...

广东志高暖通设备股份有限公司用英文是这么说吗?Guangdong chigo hva...
答:GUANGDONG CHIGO AIR CONDITIONING CO., LTD .公司名称一定不能用翻译软件去翻译的 这个要切记的 除非是很有名的公司 翻译软件里才有相应的专有名称,这个名字是志高的官网的英语网站上的名字 可以说是100%准确的 下边有其官网的网址 或你百度其官网 然后看他的英语版本 参考资料:http://www.chigo...

帮忙翻译下英文文献 出自 建筑类专业英语暖通与燃气一 第8页_百度知 ...
答:一种很常见的测压设备称为波登管式压力计。这种压力计的基本构造是一条圈状椭圆形管,其一端固定,另一端可自由移动。要测量的压力被传导到管的内侧。当管内外的压力出现差异时,自由端会移动。管的移动传导到压力计的指针。由于管外侧的压力就是大气压力,压力计的读数就是高于或低于大气压力的值。...